Installation access requirementsFor installation access requirements, please contact us.Plumbing and electrical:
2″ sanitary drain connection
Located on the wall 13″ below the floor, depending on the location relative to the treatment table waste outlet. The lateral piping from the table to the wall connection must maintain a downward drainage slope of 1/4″ per 12″.
2″ (5.1cm) Sanitary Sewer Connection
Rigid piping with dedicated P-trap configuration.
Hot and cold potable water shut-off valves
If colon hydrotherapy equipment is used to deliver treatment water, each water connection can be branched with a T-connection to supply the treatment table and colon hydrotherapy equipment. A 3/8″ compression fitting is required.
Odour venting
The ventilation system integrated into the table needs to be ventilated to the outside.
2″ PVC ducting or 2″ central vacuum ducting or 2″ central vacuum FlexTubing.
Ground fault protected power outlet: 110-240VAC. 50-60 Hz, 2.7 amps
the install video please go to:
the user video teaching: